首页|隧道施工期废水处理工程设计

隧道施工期废水处理工程设计

扫码查看
隧道工程施工期会产生多种废水,若直接排放,将对周边生态环境造成严重危害.本文以某隧道工程为例,结合设计规模及水质要求,分析废水处理工艺流程、主要构筑物设计和各处理单元处理效果.结果表明,采用"隔油沉淀池+一体化气浮过滤+固定化微生物-曝气生物滤池(G-BAF池)"处理工艺,出水水质符合《水污染物综合排放标准》(DB 11/307-2013)的B级排放标准.处理后的废水进行再生利用,部分可回用于隧道施工.
Design of Wastewater Treatment Engineering during Tunnel Construction Period
During the construction period of tunnel engineering,various types of wastewater will be generated,if discharged directly,it will cause serious harm to the surrounding ecological environment.Taking a certain tunnel project as an example,combined with the design scale and water quality requirements,this paper analyzes the wastewater treatment process,main structure design,and treatment effects of each treatment unit.The results show that using the treatment process of oil separation sedimentation tank+integrated air flotation filtration+Gaia-biological aerated filter(G-BAF tank),the effluent quality meets the B-level discharge standard of the"Comprehensive Water Pollutant Discharge Standard"(DB 11/307-2013).The treated wastewater can be recycled and partially reused for tunnel construction.

tunnelconstruction periodwastewater treatmentprocess flow

安新、赵晓涛、胡琼

展开 >

中国安能集团第三工程局有限公司成都分公司,成都 611136

隧道 施工期 废水处理 工艺流程

2024

中国资源综合利用
徐州北矿金属循环利用研究所 中国物资再生协会

中国资源综合利用

CHSSCD
影响因子:0.358
ISSN:1008-9500
年,卷(期):2024.42(1)