Air-conditioning System Testing Results and Analyses of A Commercial Building in GuangZhou
This paper analyse the cause of overflow in parallel operation of multiple cold storage tanks,and three solutions were proposed to address in this issue.The focus was on selecting and calculating the pipe diameter for the scheme of using connecting pipes to achieve hydraulic balance.