Renovation Design of Shenwan Phase Ⅲ Air Conditioning Project
This paper introduces the air conditioning system design of Shenwan Phase Ⅲ renovation project,including the comparison and selection of air conditioning cold source scheme,air conditioning water system and wind system design,and summarizes the problems in the construction service process,and puts forward suggestions.