Research on Temperature Control Scheme Determination of Mass Concrete Based on ANSYS Simulation
In order to scientifically determine the temperature control construction scheme of mass concrete in the bottom plate of pump room,ANSYS software is selected as the analysis tool,and the temperature control scheme combining cooling water pipe and jump warehouse method is preliminarily selected.According to different layout forms of cooling water pipe and construction parameters of jump warehouse method,six groups of temperature control schemes are drawn up.The line unit is used to simulate the cooling water pipe,and the"unit life and death"is used to simulate the construction technology of jump warehouse method.The temperature control simulation analysis of the proposed temperature control scheme is carried out,and finally the optimal set of temperature control schemes is obtained.This method can realize the optimal comparison and selection of different temperature control schemes for mass concrete,so as to determine the optimal temperature control scheme.This method can provide necessary decision-making guidance for the scientific determination of temperature control schemes.
temperature control schemecooling water pipejump warehouse methodfinite elementANSYS