首页|综合利用抽水蓄能电站水利与动能规划方法探讨

综合利用抽水蓄能电站水利与动能规划方法探讨

扫码查看
综合利用抽水蓄能电站水利与动能规划涉及抽水发电、防洪、供水等多个因素,同时,机组设备的最大抽水扬程、最小发电水头限值、挖库等也是水能规划的重要条件.以浙江省缙云县牛路圩中型抽水蓄能电站规划选点为背景,探讨了灌溉、储能综合利用抽水蓄能水利与动能规划的典型方法,得出规划设计过程中应重点关注的问题,即最大抽水扬程与最小发电水头比值的控制,挖库方案对抽水蓄能水利动能方案的影响,以及规划选址阶段的相关调洪计算、水位设计问题,该问题可为同类型规划设计提供参考.
Comprehensive Utilization of Water Conservancy and Kinetic Energy for Pumped Storage Power Station
The comprehensive utilization of water conservancy and kinetic energy for pumped storage power station involves many factors such as pumped power generation,flood control,water supply and so on,at the same time,the maximum pumped head of the unit equipment,the minimum power head limit as well as the excavation scheme are also important conditions for hydropower planning.Based on the planning and selection of a medium-sized pumped storage power station in Jinyun County,Zhejiang Province,the typical methods of comprehensive utilization of water conservancy and kinetic energy for pumped storage power station are discussed,including irri-gation and energy storage.The key problems in the planning and design process are obtained,such as the control of the ratio of maximum pumped head to minimum power generation head,the impact of excavation scheme on pumped storage energy,and the related flood regulation calculation and water level design in the planning and si-ting stage,which can provide reference for relevant planning and design.

pumped storage power stationcomprehensive utilizationwater conservancy planningkinetic energy planning

姚唐春、项春、马以超、杨伟俊

展开 >

缙云县水务投资有限公司,浙江缙云 321400

浙江水利水电学院水科学研究院,浙江 杭州 310018

杭州水利水电勘测设计院有限公司,浙江 杭州 310016

抽水蓄能电站 综合利用 水利规划 动能规划

2024

浙江水利水电学院学报
浙江水利水电专科学校

浙江水利水电学院学报

影响因子:0.403
ISSN:2095-7092
年,卷(期):2024.36(5)