智能城市2024,Vol.10Issue(2) :101-103.DOI:10.19301/j.cnki.zncs.2024.02.031

BIM在高铁梁场临建过程中的应用

Application of BIM in the temporary construction process of high-speed rail beam yard

周景升 赵光
智能城市2024,Vol.10Issue(2) :101-103.DOI:10.19301/j.cnki.zncs.2024.02.031

BIM在高铁梁场临建过程中的应用

Application of BIM in the temporary construction process of high-speed rail beam yard

周景升 1赵光1
扫码查看

作者信息

  • 1. 中国建筑第七工程局有限公司,河南 郑州 450001
  • 折叠

摘要

高铁梁场规划设计以安全适用、技术先进、经济合理、环保为原则,统筹规划设计,以达到制梁速度快、质量高、建场费用低、节约用地的目标.文章以平漯周高铁商水梁场为例,详细阐述BIM技术在梁场临建前期规划设计中的综合应用.

Abstract

The planning and design of the high-speed railway beam yard follows the principles of safety,applicability,advanced technology,economic rationality,and environmental protection,and is coordinated to achieve the goals of fast beam production speed,high quality,low construction costs,and land conservation.This article takes the Shangshui beam yard of Pingdingshan-Luohe-Zhoukou high-speed railway as an example to elaborate on the comprehensive application of BIM technology in the early planning and design of beam yard temporary construction.

关键词

BIM/高铁梁场/规划设计

Key words

BIM/beam yard of high speed rail/planning and design