Through the analysis of runway taxiway and terminal building configuration,this paper summarizes the development direction of alternative terminal building configuration corresponding to the spatial relationship of different running-sliding systems.According to the typical configuration,this paper tries to explain the depth scale requirements of the air side planning of the terminal area under different capacity requirements,which provides help for the early planning and design of the terminal area and the comparison and selection of the terminal building configuration.
关键词
单跑道系统/多跑道系统/前列式/指廊式/空间尺度
Key words
single runway system/multi-runway system/forefront type/gallery type/spatial scale