Production site planning of CRTSⅢ concrete track slab
The planning and design of CRTSⅢ track slab yard should be based on the overall construction period arrangement,slab making quantity,slab laying plan,and other factors,combined with local climate,topographic and geological conditions,slab yard production scale,slab making cycle,and production speed.After comprehensively comparing various schemes such as production,transportation,flood control,and environmental protection,the reasonable location and scheme should be determined.Plate yard planning and design can be divided into overall planning and design and construction planning and design.Overall planning includes determination of production efficiency,determination of plate making pedestal and plate storage quantity,main equipment configuration,and plane layout,etc.Construction planning and design mainly carries out auxiliary engineering planning and design,including power,water supply,drainage,steam,and other engineering pipeline system planning and design,etc.Construction planning should be carried out according to the overall planning of specific projects.