基于BIM技术的建筑幕墙工程成本全要素控制研究
Research on Cost Control of Building Curtain Wall Project Based on BIM Technology
赵金煜 1崔素萍2
作者信息
- 1. 北京建筑大学城市经济与管理学院,北京 100044
- 2. 北京长合汇鑫建筑装饰工程有限公司,北京 102300
- 折叠
摘要
目前,BIM在建筑幕墙工程中的应用已经越来越广泛,本文基于BIM技术针对建筑幕墙工程的设计阶段、施工阶段、质保阶段进行成本全要素控制研究,并阐述具体实施方法,丰富了建筑幕墙工程成本控制方面的理论,因此具有一定的理论意义和现实意义.
Abstract
At present,BIM has been applied more and more widely in building curtain wall projects.Based on BIM technology,this paper studies the cost all-factor control in the design stage,construction stage and quality assurance stage of building curtain wall projects,and expounds the specific implementation methods,which enriches the theory of cost control of building curtain wall projects.Therefore,it has certain theoretical and practical significance.
关键词
BIM技术/建筑幕墙工程/成本全要素控制Key words
BIM technology/building curtain wall project/cost total factor control引用本文复制引用
出版年
2024