首页|BIM技术在中山大学附属第七医院(深圳)二期项目中的实践

BIM技术在中山大学附属第七医院(深圳)二期项目中的实践

扫码查看
本文通过BIM技术在中山大学附属第七医院(深圳)二期项目的应用和分析,系统性地从BIM建筑信息模型的介绍、BIM在中山大学附属第七医院(深圳)项目中的应用范围、美国建筑师团队关于BIM技术的应用逻辑、中国建筑师和BIM工程师团队关于BIM技术的应用逻辑、MasterFormat建筑信息组织分类编码系统的介绍、Specification技术规格书的介绍、MasterFormat和Specification的应用与探索等内容阐述项目的过程,并总结相关经验以指导今后新的尝试性和突破性实践.
The Practice of BIM Technology in the Second Phase Project of the Seventh Affiliated Hospital of Sun Yat-sen University(Shenzhen)
This article systematically introduces the application and analysis of BIM technology in the Phase Ⅱ project of the Seventh Affiliated Hospital of Sun Yat-sen University(Shenzhen),including the introduction of BIM building information model,the application scope of BIM in the Seventh Affiliated Hospital of Sun Yat-sen University(Shenzhen)project,the application logic of BIM technology by the American architect team,the application logic of BIM technology by the Chinese architect and BIM engineer team,and the introduction of MasterFormat building information organization classification coding system The introduction of the Technical Specification,MasterFormat,and the application and exploration of the Specification explain the process of the project,and summarize relevant experiences to guide future innovative and breakthrough practices.

BIM technologyhospitalMasterFormatSpecification

李聪基

展开 >

北京市建筑设计研究院有限公司,北京 100032

BIM技术 医院 MasterFormat Specification

2024

绿色建造与智能建筑
中国建筑业协会

绿色建造与智能建筑

影响因子:0.074
ISSN:2097-2253
年,卷(期):2024.(1)
  • 5