首页|中心城区旧改场地深基坑实施案例浅析

中心城区旧改场地深基坑实施案例浅析

扫码查看
城市更新是城镇化发展的必然过程,也是城乡建设领域践行新质生产力的重要途径.在中心城区进行城市更新,不仅需考虑风貌融入,更应注重民生保障,减少施工对居民的影响.本文以上海松江某城市更新项目深基坑施工案例为背景,介绍了紧邻居民区、高压电缆及地铁隧道等复杂环境下,在安全、经济、合理的前提下采用多种围护形式解决紧贴电缆、承压水突涌以及遗留障碍物等难题,同时也确保了对周边环境影响在安全范围之内,通过绿色建造形式实现了中心城区旧改项目的低影响开发.
A Case Study on the Implementation of Deep Excavation in Old Renovation Sites in the Central Urban Area
Urban renewal is an inevitable process of urbanization and an important approach of implementing new quality productive forces on urban and rural construction.In the urban renewal of the central urban area,not only the integration of style and appearance should be considered,but also the livelihood security should be paid attention to,so as to reduce the impact of construction on residents.Based on the deep foundation pit construction case of an urban renewal project in Songjiang,Shanghai,this paper introduces the use of a variety of envelope-protecting forms to solve the problems of close to the cable,the sudden surge of pressurized water and the remaining obstacles under the premise of safety and economy,and also ensures that the impact on the surrounding environment is within the safe range.

urban renewaldeep excavationenvironmental sensitivity

俞琳

展开 >

上海松江新城建设开发集团有限公司,上海 201600

城市更新 深基坑 环境敏感性

2024

绿色建造与智能建筑
中国建筑业协会

绿色建造与智能建筑

影响因子:0.074
ISSN:2097-2253
年,卷(期):2024.(6)