Application Analysis of BIM Technology in Construction Engineering:Taking the Xinchuang Park Project in Beijing as an Example
This case study takes the Xinchuang Park project in Beijing as the research background,analyzes the risks and challenges in project construction,and provides a detailed introduction to the optimization role of BIM in this project from the aspects of schedule,cost,energy-saving design,and green construction.Based on this,the current status and future development trends of BIM technology are analyzed.This project has the characteristics of information intelligence,greenness,and efficient schedule cost control,which can provide useful reference for the implementation of other similar projects.