Seismic Evaluation Test of Safety Lighting System of HPR1000 Main Control Room
The design of HPR1000 main control room safety lighting system developed and applied the lighting equipment with seismic class I requirements for the first time,compared with the existing second-generation nuclear power plant,it is necessary to consider the working conditions of providing lighting in specific areas of the main control room during and after SSE.This paper describes the test purpose,test requirements,test equipment,test content and test results of the seismic identification test of the safety lighting system equipment in HPR1000 Main Control Room,and focuses on the selection of the lighting sample in the main control room,the support structure used in the test and the envelope of the floor response spectrum.
HPR1000main control roomsafety lighting systemseismic evaluation