首页|既有建筑改造五星级酒店电气设计探讨

既有建筑改造五星级酒店电气设计探讨

扫码查看
本文阐述既有建筑改造面临的规范标准变化、土建条件制约、图纸缺失现场复杂等难题,结合既有建筑改造五星级酒店的实际项目案例,针对变电所改造,发电机方案,消防电气改造,防雷系统改造及其他问题等提出合理可行的解决方案,最后针对既有建筑改造的普通性与特殊性进行总结.
Discussion on Electrical Design of Five-Star Hotels for Renovation of Existing Buildings
This paper describes the problems faced by existing building renovation,such as changes in codes and standards,constraints of civil engineering conditions,lack of drawings,site complexity,etc.Combined with the actual case of existing building renovation of five-star hotels,it puts forward reasonable and feasible solutions for the renovation of substation,generator program,fire protection and electrical renovation,lightning protection system renovation,as well as other problems,etc.It also summarizes the common and special characteristics of the renovation of existing buildings.Finally,we summarize the common and special characteristics of existing building renovation.

existing buildingsrenovation projectsfive-star hotelspower substationfire protectionlightning protection system

吴建权

展开 >

广州瀚华建筑设计有限公司,广州510630

既有建筑 改造项目 五星级酒店 变电所 消防电气 防雷系统

2024

智能建筑电气技术
亚太建筑科技信息研究院

智能建筑电气技术

影响因子:0.346
ISSN:1729-1275
年,卷(期):2024.18(6)