The Application of BIM Technology in the Project of Taoyuan Water Treatment Plant
The design scale of Taoyuan Water Treatment Plant project is 50×10⁴m³·d-1.The project is characterized by multiple single projects,many concealed pipelines,multiple equipment types and complex process pipelines.Based on the practical case of this project,the modeling method and the application effect of BIM technology of water plant engineering are studied.And then,the method of collaborative building and integration of professional BIM models of architecture,structure and process is proposed,which realizes the application of 3D visualization of drawings,components collision detection,deepening design of technological process,information integration of manufacturing facilities of the water treatment plant,etc.It solves the problem of rework caused by inefficient information transmission of the participating party and the"errors,omissions,collisions and defects"of design drawings.Finally,it achieves the effect of reducing project site visa,optimizing design drawings,saving investment,and improving communication efficiency and project management level.
water treatment plant projectBIM technologyRevit3D visualizationcollision detection