Taking the prefabricated steel structure dormitory in a factory in Taicang,Suzhou as an example,this paper mainly expounds the selection of the laying and installation methods of electrical equipment and pipeline in the project through the problems encountered in the design process,so as to meet the reasonability and compliance,and rapidity and efficiency of production and installation of prefabricated steel structure buildings and structural prefabricated components.
关键词
装配式建筑/钢结构建筑/电气设计/设备管线/深化设计
Key words
prefabricated buildings/steel structure building/electrical design/equipment and pipeline/detailed design