摘要
城市轨道交通施工具有工期紧、任务重、隐患多等特点,必须加强现场组织管理,采用科学技术手段,减少资源浪费和安全风险.文章研究了BIM技术在城市轨道交通施工阶段的应用,从碰撞检测、进度计划、施工模拟、资源调配、动态调整等方面出发,分析施工进度管理中BIM技术的应用要点,并强调BIM技术在安全规划、安全监测、安全检查、安全预警、安全教育等方面的作用,有利于提升城市轨道交通施工阶段进度管理和安全管理水平.
Abstract
Urban rail transit construction has the characteristics of tight schedule,heavy tasks,and multiple hidden dangers.It is necessary to strengthen on-site organization and management,adopt scientific and technological means,and reduce resource waste and safety risks.The paper studies the application of BIM technology in the construction stage of urban rail transit.Starting from collision detection,schedule planning,construction simulation,resource allocation,dynamic adjustment,etc.,it analyzes the application points of BIM technology in construction schedule management,and emphasizes the role of BIM technology in safety planning,safety monitoring,safety inspection,safety warning,safety education,and other aspects,It is helpful to improve the progress management and safety management level of urban rail transit construction phase.