The complexity and high technical requirements of the adjacent high-speed railway bridge projects make it difficult for the traditional construction control mode to meet the needs of modern engineering construction. The emergence of intelligent control technology can improve the whole-process construction control effect of the adjacent high-speed railway bridge. This paper studies the innovation path of intelligent control technology in the whole process of adjacent high-speed railway bridge engineering,and analyzes the technical measures of intelligent control technology in the entire process of fine control in adjacent high-speed railway bridge engineering from the three stages of design,construction and maintenance on the basis of mastering the characteristics of the project. At the same time,it emphasizes the technical complexity,data accuracy application challenges and corresponding countermeasures,aims to improve the control level of the whole process of engineering.
关键词
邻近高铁桥梁/智能控制技术/全过程管理/技术创新/数值模拟
Key words
adjacent high-speed rail bridge/intelligent control technology/whole process management/technology innovation/numerical simulation