首页|西安市某大型废弃物综合处置场设计及建设案例分析

西安市某大型废弃物综合处置场设计及建设案例分析

扫码查看
介绍了西安市固体废弃物综合处置场项目的设计、建设和运营过程.首先,概括介绍了该项目的背景概况、目标规划和处理规模等情况.其次,详细论述了项目设计的基本情况,例如填埋场各功能区总图布置的确定、坝体的设计、防渗系统结构的选用以及地下水及渗沥液导排、渗沥液收集等系统设计问题.最后,分析了建设过程中可能遇到的各种风险问题并提出了规避风险的思路方法,以及该项目部分飞灰填埋库区的试运营情况,对飞灰填埋作业进行了详细细致的要求,以期为后续正式投运积累了实操运行及管理经验.
Case study on the design and construction of a large waste disposal site in Xi'an City
This paper introduced the design,construction and operation process of Xi'an solid waste comprehensive disposal site.Firstly,the background,target planning and processing scale of the project were introduced.Secondly,the basic situation of the project design was discussed in detail,such as the determination of the layout of each functional area of the landfill,the design of the dam body,the selection of the structure of the anti-seepage system,and the system design of groundwater and leachate drainage and leachate collection.Finally,the paper analyzed various risks that may be encountered in the construction process and put forward ideas and methods to avoid risks,as well as the pilot operation of the fly ash landfill reservoir area of the project department,and carried out detailed requirements for the fly ash landfill operation,in order to accumulate practical operation and management experience for the subsequent formal operation.

solid waste comprehensive disposal sitefly ashrisk managementcase study

张洋、任子曦、郭堤

展开 >

延安大学石油工程与环境工程学院,陕西延安 716000

西安市固体废弃物处置中心,陕西西安 710000

延安市农业固体废弃物资源化利用重点实验室,陕西延安 716000

固体废弃物综合处置场 飞灰 风险管理 案例分析

延安大学博士科研启动项目延安市科技计划项目

YAU2023037902022SLZDCY-011

2024

再生资源与循环经济
天津再生资源研究所 中国再生资源回收利用协会

再生资源与循环经济

影响因子:0.367
ISSN:1674-0912
年,卷(期):2024.17(2)
  • 8