The Defis Coal Mine in Türkiye is located in the Soma Basin of Manisa Province.Due to the complex geological structure,many faults,and a certain dip angle of the working face,there are problems such as scraper machine and hydraulic support"moving up and down"and drifting in the mining process of the working face,which seriously restrict the productivity,which seriously restrict the productivity.Through theoretical analysis of the stress of the equipment,targeted adjustments were made to the coal mining process in the mine,ensuring the smooth use of the"three machines"complete set of equipment in the P01 working face.For the second set of e-quipment purchased by the mining company,we optimized the equipment layout and connection methods from the supporting level by improving the structure of the scraper conveyor and hydraulic support on the working face,greatly enhancing the production adaptability of the equipment.We successfully solved problems such as"upward movement and downward movement"and drifting,and achieved the goal of an annual production capacity of 3 million tons of the working face.
"three machines"equipmentfully-mechanized top coal cavingcomplete set"moving up and down"drifting