新街台格庙煤—气重叠区天然气井立体封堵方法

扫码查看
进入统筹建设阶段的国家重点特大型新街台格庙矿区,其煤炭资源与苏里格气田东部、大牛地气田北部完全重叠.针对传统天然气井封堵工艺不能满足双方的安全生产和资源回收需求,提出"五段封堵、三层阻隔、查固补注、分段用材、层层质检"的天然气井立体全井段封堵方法:套管内建立气层段、中部地层段、煤层段、淡水层段和井口的全井段封堵体系;水泥塞与机械塞搭配设置3层合理的封堵屏障;开展固井情况评估,封隔套管外环空通道;气层段封堵使用超细油井水泥,确保封堵半径的有效密封性,其余封堵段使用G级油井水泥;带压候凝、下钻探塞面和逐级试压评估封堵质量.该方案封堵实验表明,封堵质量完全合格.
Three-dimensional plugging method of natural gas well in coal-gas overlapping area of Xinjie Taigemiao
The national key and super large Xingjie Taigemiao mining area,which has entered the stage of coordinated construction,has coal resources that completely overlap with the eastern part of the Sulige gas field and the northern part of the Daniudi gas field.In view of the traditional natural gas well plugging technology can not meet the safety production and resource recovery needs,a three-dimen-sional whole-well plugging method of"five-stage plugging,three-layer blocking,checking and replenishing,segmented materials,and layer by layer quality inspection"was proposed.The whole-well section plugging system of gas section,middle formation section,coal section,freshwater section and wellhead section was established in casing.The combination of cement plug and mechanical plug provid-ed three layers of reasonable blocking barriers,performed cementing assessment and sealed off casing outer annulus passage.The gas section was sealed with ultra-fine oil well cement to ensure effective sealing of the sealing radius,and the remaining sections were sealed with G-class oil well cement.The sealing quality was evaluated by pressurized coagulation,touch top of cement and step by step pressure test.The plugging test shows that the plugging quality is fully qualified.

coal-gas overlapping areagas well pluggingnatural gas wellwhole-well section

谢松岩、魏飞飞、马君霞、董俊亮

展开 >