Feasibility study on comprehensive utilization of mine waste heat resources
In the context of"Dual Carbon",the emission reduction,consumption reduction,energy saving and environmental protection of enterprises have been given the primary position and height.In order to reasonably and efficiently utilize the large amount of waste heat resources generated in the production process of Wangpo mining area and promote the green and low-carbon development of enter-prises,an investigation and analysis were conducted on the available waste heat resources and cold and hot load conditions in the mining area.Based on the actual situation of the mining area,a feasible plan of"multi-stage waste heat resource recycling and utilization sys-tem"was proposed and established.Through multi energy complementary coupling technology,efficient reuse of mine waste heat re-sources was achieved,meeting the heating and cooling needs of the mining area.And a comparative analysis was conducted on the in-vestment and operational benefits between this scheme and the natural gas boiler heating scheme.The research results indicate that com-pared with the natural gas boiler system,this system can reduce operating costs by more than 1.22 million yuan,reduce pollutant emis-sions,and have positive significance for promoting sustainable development of enterprises.
waste heat resourcescomprehensive utilizationenergy saving and emission reductionoperating costsbenefit analysis