Risk Analysis of Freeway Lane Closure During Peak Period
扫码查看
点击上方二维码区域,可以放大扫码查看
原文链接
NETL
NSTL
This paper examines risks associated with peak period lane closure during construction or maintenance work on urban freeways. In accordance with recently implemented policy by the Colorado Department of Transportation, lane closure would be allowed if reserve capacity were available. A relatively minor accident in the work zone caused substantial delays during the peak period that virtually paralyzed traffic in the Denver, Colorado, metropolitan area. This occurrence caused reexam-ination of the existing lane closure policy. Generally speaking, if a contractor is allowed greater flexibility in establishing work schedules, including the ability to work through peak periods, a lower bid can be expected. This paper compares savings in the cost of construction related to allowing lane closure during peak periods with the cost of potential incident-related delays in the framework of a quantitative risk analysis.
Jake Kononov、Zane Znamenacek
展开 >
Colorado Department of Transportation, 2000 South Holly, Denver, CO 80222