首页|Integrated Production Planning, Scheduling and Shop Floor Tracking system for High-Mix Low-Volume Manufacturing - A Consortium Approach
Integrated Production Planning, Scheduling and Shop Floor Tracking system for High-Mix Low-Volume Manufacturing - A Consortium Approach
扫码查看
点击上方二维码区域,可以放大扫码查看
原文链接
NETL
NSTL
Trans Tech Publications Ltd
In Singapore, the Precision Engineering (PE) industry is the backbone of the manufacturing sector; it supports a large number of manufacturing industries such as Electronics, Chemicals, Pharmaceuticals, Biotechnology, Aerospace, Oil & Gas and Automotive. From our recent visits to companies in the PE industry, it was observed that given such a dynamic and stochastic manufacturing environment, most of these PE companies are still predominantly using Microsoft Excel as their planning & scheduling tool, shop floor tracking is normally performed manually through paper traveler, and production status is only updated at the end of the day or as and when demanded by customer. The common problems highlighted include inability to provide realistic delivery commitment, machine and manpower resources are not optimally utilized to fulfill customer orders, unacceptable order cycle time and lack of production visibility. Therefore, there is an increasing demand and impending need for a computerized integrated production planning/scheduling and shop floor tracking system. In this paper, a consortium approach for the development of an integrated production planning/scheduling and shop floor tracking system for the High-Mix Low-Volume (HMLV) PE environment is presented. An illustration through the implementation of the proposed system in a PE company is highlighted. With this system, companies would be able to improve their delivery performance through effective handling of ad-hoc customer orders and the ability to react to deviations or unplanned events in production.
production planningproduction schedulingshop floor trackinghigh-mix low-volume manufacturing
Tay Jin Chua、Chak Huah Tan、T. X. Cai、G. H. Phua、Leck Leng Aw、Y.L. Huang