首页|Patent Issued for Monitoring progress of object construction (USPTO 11972536)
Patent Issued for Monitoring progress of object construction (USPTO 11972536)
扫码查看
点击上方二维码区域,可以放大扫码查看
原文链接
NETL
NSTL
Reporters obtained the following quote from the background information supplied by the inventors: “Before construction of a building is initiated, it may be des igned in 3D using BIM modelling tools such as Autodesk Revit, Trimble Tekla, or Graphisoft ArchiCAD. A 3D design consists typically of several individual files/ models for multiple disciplines such as architect, structural engineering, mecha nical, electrical, plumbing, etc., each managing different mechanical or functio nal sub-parts of the building, such as electrical wiring, plumbing, ventilation etc. Lots of other levels of details can also be part of the design process, suc h as safety, foundation, landscaping etc. Combining all these sub-models into a single model is referred to as the federated model. Here, a sub-model is referre d to as a BIM model and the combined federated model is referred to as the actua l BIM building.
CyborgsDalux ApsEmerging Technologie sMachine Learning