摘要
从发明人提供的背景资料中,新闻记者得出了以下结论:报价:“施工现场、采矿现场和/或大型挖掘现场可使用导向作业机械,”E .G .挖掘、装载和/或拖运机,用于移除和搬运挖掘的材料,例如矿石或从挖掘区域到加工地点的超载。许多因素可能影响工作机器在这些地点的生产力和效率,包括机器操作条件(例如,充电状态数据、健康状态数据、使用统计、维护数据、行驶速度数据,温度数据、部件的磨损、有效载荷、轮胎压力等)、现场条件(例如,天气、能见度、材料组成、地形轮廓、路线条件和交通、地面湿度机械操作员的技能或经验水平。因为各种任务的有效分配对于这些工作机器可能是复杂和计算密集的,我们制定了详细的计划来实现管理工作机器和现场活动。
Abstract
From the background information supplied by the inventors, news correspondents o btained the followingquote: “Construction sites, mining sites, and/or large-sca le excavating sites may use guided work machines,e.g., digging, loading, and/or hauling machines, to remove and carry excavated material, e.g., ore oroverburd en, from an area of excavation to a processing location. Numerous factors may in fluence theproductivity and efficiency of the work machines at such sites inclu ding, machine operating conditions(e.g., state-of-charge data, state-of-health data, usage statistics, maintenance data, travel speed data,temperature data, w ear and tear on components, payload, tire pressure, etc.), site conditions (e.g. ,weather, visibility, material composition, terrain contour, route conditions a nd traffic, ground moisturelevels, etc.), skill or experience level of the mach ine operators. Since efficient assignment of various tasksto these work machine s may be complex and computationally intensive, detailed plans are put in place tomanage the work machines and the activities on the site.