首页|PLANNING MUNICIPAL DRAINAGE INFRASTRUCTURE MAINTENANCE OPERATIONS WITH FINITE AVAILABLE CREWS: PRAGMATIC OPTIMIZATION APPROACH

PLANNING MUNICIPAL DRAINAGE INFRASTRUCTURE MAINTENANCE OPERATIONS WITH FINITE AVAILABLE CREWS: PRAGMATIC OPTIMIZATION APPROACH

扫码查看
to concurrent jobs in the context of municipal drainage infrastructure maintenance. The problem was defined from the perspective of a project manager involved in planning such operations on a day-by-day basis. The problem statement was then transformed into a simplified Integer Linear Programming optimization model. Performance metrics were devised to evaluate the optimization model's effectiveness. A heuristic algorithm representing the decision-making process by a seasoned planner in the partner company was also developed. Both methods were applied to a case study and contrasted based on the same performance metrics. The findings underscored substantial optimization benefits in rendering decision support in resource-constrained drainage construction operations planning. In conclusion, this research presents an alternative strategy for navigating the complexities inherent in finite crew resource allocation on multiple concurrent drainage projects; lends a cost-effective optimization solution to improving the utilization of finite available crews while satisfying service demands from multiple clients to the largest extent possible.

municipal infrastructurescrew allocationoptimizationdrainage maintenance schedulingmultiple scattered sitesshort-term planning

Bayesteh, Ali、Lu, Ming、Lakshminarasimhan, Prasanna

展开 >

Donadeo Innovat Ctr Engn ICE Edmonton

EPCOR Drainage Infrastruct

2024

Journal of civil engineering and management

Journal of civil engineering and management

EISCI
ISSN:1392-3730
年,卷(期):2024.30(8)
  • 23