绿春县登天门景区边坡工程治理方案研究
Study on Slope Engineering Treatment Plan of Dengtianmen Scenic Spot in Lvchun County
杜泽1
作者信息
- 1. 中国有色金属工业昆明勘察设计研究院,云南昆明661000
- 折叠
摘要
对云南省红河州绿春县登天门景区边坡工程进行地质调查可知,场地附近无溶洞、地下采空区等不良地质情况;场地西侧局部存在崩塌现象,处于极限平衡状态;场地南侧为省道214挖方路基边坡,该路段边坡支护已破坏,路基边坡稳定性较差,为存在隐患的不稳定边坡.因此,单一的挡土墙技术难以解决上述问题,应及时采取有效的综合治理措施对该景区边坡工程进行维护.
Abstract
Through investigation on slope engineering in Dengtianmen scenic spot in Lvchun County,Honghe Prefecture,Yunnan Province,there was no bad geological conditions such as karst cave,underground mined out area; on the west side,there was collapse phenomenon,which is in the limit equilibrium state; on the south side,there was highway 214 excavated roadbed slope,the road slope supporting had been destroyed,subgrade slope stability was poor.Retaining wall technology is difficult to solve the above problems,effective countermeasures should be adopted timely to protect the slope project in the scenic spot.
关键词
边坡工程/地质构造/分析/综合治理方案Key words
Slope engineering/Geological structure/Analysis/Comprehensive treatment plan引用本文复制引用
出版年
2016