Investigation and analysis of crack structural surface at the Yuetan Reservoir dam site
In order to conduct analysis summary for low-anglefracture structural planes of the Yuetan Reservoir dam foundation,various methods are adopted in this paper,including geological surveying,borehole imaging,and exploration adit,which provides a basis for the anti-skid stability analysis of the dam foundation.