Whole Process Control Scheme of Vibration and Noise for Surveying Vessels
In order to ensure that the vibration and noise indicators of a large surveying vessel of a certain maritime system meet the mission requirements and successfully complete the surveying tasks in the far-reaching sea areas and sea lanes under the country's jurisdiction,through the analysis of various vibration and noise indicators of the surveying vessel,the control scheme is formulated and implemented in five stages,including design,factory acceptance test,construction,mooring test and navigation test,and the forensic verification scheme is completed in the navigation test stage,thus forming a whole process vibration and noise control scheme.The research results can provide some reference for the whole process control of vibration and noise control of scientific research vessels.