Design Essentials of Industrial Park Site in Complex Landform of Mountainous Region for Ningde City
The construction site of mountainous industrial park has large topographic relief and complex geological conditions.Under this natural terrain background,the stepped layout scheme is commonly used for the park site.The factory roads are used to connect every stepped place,which causes a series of design problems in the factory manned slope and natural slope.It is necessary to summarize the technical experience of the design scheme.In view of this,taking the Fujiang Province Zhouning County Station Industry and Trade Park Project as an example,a series of key problems of site general plan,building layout,factory area road,drainage measures,high slope support engineering,etc.in this landform of design scheme are summarized in order to provide some design ideas for similar projects.