北外滩滨江作为最后开发的岸线,建成后将成为北外滩世界级会客厅的重要窗口.为应对北外滩复杂的水文、地势地质及周边环境条件,结合实际经验,综合分析工程的水文地质、地形条件,采用水陆域统筹考虑的总体思路、创新的防汛墙设计对策、施工组织方案,实现了防汛墙的安全建设和按期完工,进而满足北外滩滨江的总体要求,达到了世界级滨水体验的要求.
Design Countermeasures for Flood Control Wall of Huangpu River in North Bund under Complicated Conditions
As the last development of the shoreline,the North Bund Riverside will become an important window of the world-class reception room of the North Bund after its completion.In response to the complex hydrological,geological,and surrounding environmental conditions of the North Bund,combined with the practical experience,the hydrogeological and topographic conditions of the project are analyzed comprehensively.By adopting the general idea of overall considering the water and land,and innovating the flood control wall design countermeasures and construction organization scheme,the safe construction of the flood control wall are realized and the project is completed on schedule,thus meeting the overall requirements of the North Bund Riverside and the requirements of a world-class waterfront experience.

complex conditionsNorth Bundflood walldesign countermeasures

兰士刚

展开 >

上海市堤防泵闸建设运行中心,上海市 200050

复杂条件 北外滩 防汛墙 设计对策