首页|无锡市某污水处理厂五期工程设计方案

无锡市某污水处理厂五期工程设计方案

扫码查看
根据《无锡市排水(污水)专项规划(2010-2020)》《无锡市城镇污水处理提质增效行动实施方案(2019-2021)》文件要求,无锡某污水处理厂处理规模需于2025年达到25万m3/d,即扩建3万m3/d.由于五期工程项目边界条件复杂,用地极其紧张,需对厂内现有处理构筑物进行计算分析并加以充分利用,因地制宜,在受限条件下进行挖潜改造.本工程建成投运至今,出水水质稳定达标.通过介绍污水处理工艺AAO+MBR及主要构筑物的设计思路及参数,总结工程特点,为其他类似工程提供借鉴.
Design Scheme of Wastewater Treatment Plant Phase V Project in Wuxi
According to the requirements in Wuxi City Drainage(Sewage)Special Plan(2010-2020)and Wuxi City Town Sewage Treatment Quality and Efficiency Improvement Action Implementation Scheme(2019-2021),the treatment scale of a wastewater treatment plant(WWTP)in Wuxi needs to reach 250 000 m3/d in 2025,that is,an expansion of 30 000 m3/d.Due to the complex boundary conditions of the Phase V project and the extremely limited land use,it is necessary to calculate and analyze the existing treatment structures in the plant and make full use of these structures.The potential reconstruction is carried out under the limited conditions according to local conditions.Since the completion and operation of this project,the quality of the effluent has reached the standard steadily.By introducing the sewage treatment process AAO+MBR and the design ideas and parameters of the main structures,the engineering characteristics are summarized to provide the reference for the other similar projects.

wastewater treatment plant(WWTP)extensionAAO+MBR process

徐瑛、张晶瑶、叶亮、汪娴

展开 >

无锡市政公用环境检测研究院有限公司,江苏无锡 214000

上海市政工程设计研究总院(集团)有限公司,上海市 200092

无锡市水务集团有限公司,江苏无锡 214000

污水处理厂 扩建 AAO+MBR工艺

2024

城市道桥与防洪
上海市政工程设计研究院

城市道桥与防洪

影响因子:0.477
ISSN:1009-7716
年,卷(期):2024.(3)
  • 3