首页|地形高程远大于区域规划高程时立交方案研究

地形高程远大于区域规划高程时立交方案研究

扫码查看
受区域环境和发展战略影响,偶有区域规划高程与现状场地高程存在较大差异的情况,需要统筹考虑近期工程量控制与远期场地标高变化后的衔接要求.本文以青岛市董家口港区中心路-子信路的立交项目为例,受规划港区和临近铁路影响,区域规划高程低于现状高程约20 m.项目巧妙利用了场地高程,缩减了桥梁段的长度,减少了挖方工程量,并兼顾了远期区域标高降低后的放坡衔接;同时通过对立交选型的优化比选,减少了立交项目与铁路的冲突.总体既实现了对交通安全的保证,又达到了减少对铁路的影响、降低造价的目的.
Study on Interchange Scheme for Topographic Elevation Much Higher Than Regional Planning Elevation
Due to the influence of regional environment and development strategy,sometimes there is a big difference between the regional planning elevation and the current site elevation.It is necessary to consider the connection requirements for the recent engineering quantity control and after the long-term site elevation change.Taking the Zhongxin Road-Zixin Road Interchange Project in Dongjiakou Harbor Area of Qingdao as an example,affected by the planned harbor area and adjacent railway,the regional planned elevation is about 20 meters lower than the current elevation.The site elevation is cleverly used in the project to reduce the length of the bridge section,decrease the amount of excavation works and take into account the slope connection after the reduction of long-term regional elevation.At the same time,the conflict between the interchange project and the railway is reduced by optimizing and selecting the interchange types.The overall purpose is to ensure the traffic safety,reduce the impact on the railway and reduce the cost.

interchangeelevation planningrailway conflict

舒姚轲

展开 >

上海浦东建筑设计研究院有限公司,上海市 201206

互通立交 高程规划 立交铁路冲突

2024

城市道桥与防洪
上海市政工程设计研究院

城市道桥与防洪

影响因子:0.477
ISSN:1009-7716
年,卷(期):2024.(9)