Research on Layout Scheme of On-ramp and Off-ramp at Node of Pujian Road Overpass Bridge in Yanggao Road Reconstruction Project
Since the issue of Shanghai Urban Master Planning(2017-2035),the urban construction of Shanghai has shifted from the rapid development to a construction thinking of refined governance and comprehensive reconstruction.Taking the Pudong New District Yanggao Road(Century Avenue-Pujian Road)Reconstruction Project as the background,after the completion of the project,based on the actual road operation situation,the causes of traffic bottlenecks are analyzed.Combined with traffic demand,a layout scheme for adding on-ramp and off-ramp is studied.On the basis of ensuring the function of composite corridor in Yanggao Road,the maximum function is achieved in limited space to solve traffic bottlenecks.