Overall Design of Cangning Road Crossing Urban Water System in Shijiazhuang City
Cangning Road is the main road from east to west of the third ring road in the southeast of Shijiazhuang City.The numerous municipal elements of roads,bridges,utility tunnels,municipal main pipe lines and rail transit are integrated in the red line.The nodes crossing the urban water system are even closer to the planned subway stations.Combined with the natural construction conditions of the nodes crossing the urban water system and the boundary conditions required by various departments such as water system,landscaping,rail and drainage.the feasibility of design schemes for the bridge,utility tunnel and drainage pipeline is analyzed in different disciplines.Finally,the overall design scheme of Cangning Road is determined.