Analysis of Key Points in Budgeting for High-pier Steel Box Girder Overpass
With the development of the social market economy the municipal bridge engineering has also made great progress.Due to the diverse structural forms of bridge engineering,complex terrain on site,and complex bridge types,the bridge budget preparation is difficult in some aspects.In budget preparation engineering,due to unclear understanding of construction drawings and unreasonable construction schemes,the calculation of engineering quantities is inaccurate and the application of quotas is unreasonable,which result in low accuracy of budget preparation This has brought about significant deviations in engineering cost control and construction costs,which affects the entire construction process.Taking the budgeting of a high-pier steel box girder overpass in an area as a case,the cost analysis is carried out according to construction procedures,construction schemes,quantity calculations,and key points and difficulties in budgeting.The experience can be used for mutual learning and exchange.