Key Design Points of the Reserved Rail Tran-sit Project in Xiong'an New Area Under-ground Integrated Transportation Hub
[Objective]In view of the inconsistency in the construction schedule of the large underground integrated trans-portation hub in Xiong'an New Area,it is necessary to con-duct in-depth research on the key design points of the reserved rail transit projects in the construction of above-mentioned transportation hub,in order to reduce the impact of secondary construction and lower the difficulties,risks and investments in later stages.[Method]The basic profiles of hubs such as Xiong'an Intercity Station,Xiaoli Station and Financial Island Station in Xiong'an New Area are introduced.The necessity of reserving rail transit projects in underground integrated trans-portation hub is analyzed.The design concepts for the above projects are summarized,and their key design points are ex-tracted.[Result & Conclusion]Key design points for the re-served rail transit project in the transportation hub are as fol-lows:The system types and vehicle formations shall be deter-mined based on the planning conditions;Reasonable station lo-cations and station types shall be decided with the idea of over-all optimization;Station and city integration shall be used as a strategy to coordinate urban and traffic functions;The layout plan of the hub shall be improved with the concept of integrated design;Following the principle of intensive and appropriate de-velopment,the phased construction of the hub shall be studied;The reserved and pre-embedded measures shall be coordinated for detailed implementation.
Xiong'an New Areaunderground integrated transportation hubreserved rail transit project