首页|施工道路永临结合在EPC项目中的应用

施工道路永临结合在EPC项目中的应用

扫码查看
随着我国经济建设的迅速发展及国家对建筑行业管理的不断完善,设计—采购—施工总承包模式(EPC)逐渐成为当前工程项目管理的主流模式。该模式可以有效解决项目设计、采购、施工、试运行等阶段的矛盾冲突,缩短周期、降低成本、提高效率。厦门某厂房项目整体用地面积和楼栋单体面积均较大,工期紧,若采用传统施工方法,临时道路的建设不仅工期长、成本高,且后期道路拆除产生大量建筑垃圾,不符合环保和绿色施工的要求。本项目采用EPC管理模式,在设计阶段将临时道路与永久道路做法进行结合,具有良好的经济、工期、环保效益,达到了预期的目的。
The Application of the Combination of Permanent and Temporary Roads in the EPC Projects
With the rapid economic development and continuous management improvement of the construction industry in our country,the engineering procurement construction(EPC)model has gradually become the mainstream mode of the current engineering project management.This model can effectively solve conflicts and contradictions in project design,procurement,construction,trial operation,and other stages,shorten the cycle,reduce costs,and improve the efficiency.A factory project in Xiamen has a relatively large overall land area and a large individual building area,and a tight construction period.If the traditional construction method is adopted,the construction of temporary roads not only has a long construction period and high costs,but also generates a large amount of construction waste in the later demolition of the roads,which does not meet the requirements of environment and green construction.The project adopts EPC management model,and combines the temporary roads and permanent roads in the design stage,which has good economic and environmental benefits and a shortened construction period,achieving the expected goal.

EPCconstruction roadcombination of permanent and temporary roadsenergy saving and emission reduction

周静、孟汉文、桂运全、王欢、陈欣

展开 >

中建三局第三建设工程有限责任公司

中建三局(福建)投资建设有限公司

EPC 施工道路 永临结合 节能减排

2025

城市建筑
黑龙江科学技术出版社

城市建筑

影响因子:0.761
ISSN:1673-0232
年,卷(期):2025.22(2)