首页|面向地下管线普查测绘的管道构件BIM参数化建模方法

面向地下管线普查测绘的管道构件BIM参数化建模方法

扫码查看
以数据驱动的方式构建管道构件模型,需要将所有二维平面数据转换为三维可视化数据,建模时间较长.因此,提出面向地下管线普查测绘的管道构件BIM(建筑信息模型)参数化建模方法.首先,将地下管线管道的主体结构分解为多个构件,并将每个构件的截面数据作为参数化建模的基础.然后,运用BIM技术分析管道构件的参数化特征,构建包含几何参数、材料参数、位置参数等的BIM项目族库,结合现场采集的少量基础数据为各类型参数赋值.接着,从平行、相切等几何约束关系入手,定义建模约束条件.确定基础建模基准点后,导入BIM项目族库中的各项参数,得到管道构件三维可视化模型.实验结果表明,此方法整体建模时间较短,可以更好地辅助地下管线普查测绘工作.
BIM Parameterized Modeling Method for Pipeline Components for Underground Pipeline General Survey
Constructing pipeline component models in a data-driven manner requires converting all 2D plane data into 3D visualization data,which takes a long modeling time.Therefore,a parameterized modeling method for BIM of pipeline components for underground pipeline general survey is proposed.Firstly,the main structure of un-derground pipelines is decomposed into multiple components,and the cross-sectional data of each component is used as the basis for parameterized modeling.Then,BIM technology is used to analyze the parameterized features of pipe-line components,construct a BIM project family library that includes geometric,material,and positional parameters,etc,and assign values to various types of parameters based on a small amount of basic data collected on site.Next,starting from geometric constraint relationships such as parallelism and tangency,define modeling constraint condi-tions.After determining the baseline for basic modeling,import various parameters from the BIM project family li-brary to obtain a 3D visualization model of pipeline components.The experimental results show that the proposed method has a shorter overall modeling time and can better assist in underground pipeline general survey work.

underground pipelinesgeneral surveypipeline componentsBIMparametric modeling

苏骏

展开 >

长三角(嘉兴)城乡建设设计集团有限公司,浙江嘉兴 314050

地下管线 普查测绘 管道构件 BIM 参数化建模

2024

地矿测绘
云南省地矿测绘院

地矿测绘

影响因子:0.421
ISSN:1007-9394
年,卷(期):2024.40(1)
  • 10