Design and realization of the control scheme for engineering vehicle to automatically pass through the no-power zone
Taking the engineering vehicle with the third rail and the battery power supply mode as the research object,this paper proposes an automatic control scheme for passing through the no-power zone.It presents the principle to identify the no-power zone,the control flow of the engineering vehicle passing through the non-power zone,and the control logic of the engineering vehicle passing through the no-power zone in the third rail power supply mode and the power supply mode switching.The experimental verification and practical application results show that the control scheme is realized by the train control and management system to realize the related functions of the engineering vehicle automatically passing through the no-power zone,without the driver's manual operation.The operation efficiency of the vehicle passing through the no-power zone is improved.
engineering vehiclepower supply modethird railbatteryno-power zone