首页|配电网智能柱上断路器优化配置策略

配电网智能柱上断路器优化配置策略

扫码查看
针对配网一二次融合柱上断路器的安装优化问题,分析配电网故障时柱上断路器和熔断器的配合动作,建立用户停电时间与柱上断路器位置之间的模型.考虑以柱上断路器投资费用、运行费用和停电损失之和为最小的优化目标模型,通过改进引力搜索算法提升寻优速度,增强算法跳出局部最优的能力.对IEEE-RBTS BUS6系统进行案例分析.结果表明,所提策略能优化柱上断路器的安装数量和位置,提升了配电网运行的经济性和可靠性.将所提方法应用到配网柱上断路器优化配置中是合理且有效的.
Optimized Configuration Strategy for Intelligent Pole-mounted Circuit Breakers in Distribution Networks
Aiming at the optimization of the installation of pole-mounted circuit breakers in the distribution network,the coordinated action of pole-mounted circuit breakers and fuses was analyzed,and the model between customer outage time and pole-mounted circuit breaker position was established.Considering the optimization objective model that minimized the sum of investment cost,operating cost,and outage loss of pole-mounted circuit breakers,by improving the gravitational search algorithm,the optimization speed was raised and the algorithm's ability to jump out of local optima was enhanced.A case study was conducted on the IEEE-RBTS BUS6 system.The results show that the proposed strategy can optimize the installation number and location of pole-mounted circuit breakers and effectively improve the economy and reliability of distribution network operation.Applying the proposed method to the optimal allocation of the pole-mounted circuit breakers is reasonable and effective.

distribution networkoptimal allocationpole-mounted circuit breakergravitational search algorithm

沈晨、杨欢红、张剑、程翔、潘伟杰、严灵杰、柴磊

展开 >

国网上海市电力公司奉贤供电公司,上海 201499

上海电力大学,上海 200090

配电网 优化配置 柱上断路器 引力搜索算法

国家电网上海市电力公司科技项目

520923220002

2024

电气自动化
上海电气自动化设计研究所有限公司 上海市自动化学会

电气自动化

CSTPCD
影响因子:0.377
ISSN:1000-3886
年,卷(期):2024.46(2)
  • 8