复合地层超长联络通道机械法建造方案研究

扫码查看
常规工法在长距离联络通道建造过程中存在风险大、工期长等诸多负面问题,为解决此问题,拟在华南复合地层首次采用机械法联络通道建造方案,为此从整体方案、工法选择、设备设计及管片设计等方面进行研究,结果表明:机械法联络通道工法在复合地层具有适用性,可解决长距离、大夹角、大倾角的工程难题;通过修改管片设计方案,将机械法联络通道中管片拼装方式由径向插入修改为先纵向插入后径向插入是可行的.
Mechanical Method Construction Scheme for Ultra-long Connection Channels in the Composite Formation Area
To address the challenges of high risk and extended construction periods associated with conventional methods for building long-distance connection channels,this study introduces a mechanical method in the composite formations of South China for the first time.Research focused on the overall project plan,selection of construction methods,equipment choices,and segment structure design,which led to the successful implementation of the project based on these findings.The following conclusions can be drawn:the mechanical method of connecting channels can solve engineering problems with long distances,large angles,and large inclinations and is applicable to composite formations in South China;it is feasible to change the assembly method of pipe segments from radial insertion to longitudinal insertion followed by radial insertion,by modifying the pipe segment design scheme.

urban rail transitmechanical method for cross-passagescomposite formationequipment designsegment structure designassembly modes

魏旭鹏、付增、程鹏、李鹏、张东彦

展开 >

中铁工程装备集团有限公司,郑州 450016

中铁工业制造专业研发中心城市地下空间开发技术与装备研发分中心,郑州 450016

杭州未来之城地下空间规划设计研究院有限公司,杭州 311215

城市轨道交通 机械法联络通道 复合地层 设备设计 管片设计 拼装方式

2024

都市快轨交通
北京交通大学,北京城建设计研究总院有限责任公司

都市快轨交通

CSTPCD北大核心
影响因子:0.785
ISSN:1672-6073
年,卷(期):2024.37(6)