首页|某酒店项目塔楼结构设计与分析

某酒店项目塔楼结构设计与分析

扫码查看
某酒店项目因规划指标的控制要求,占地面积较小而容积率较高,设备管线的变化和转换给结构设计带来较大影响.结构设计出现了扭转不规则、穿层柱、转换、刚度突变、净高受限等多种不利情况.本文通过多种结构方案的比选,确定了既能满足净高需要又能满足结构指标的布置方案;分析了各项不规则情况,并对不规则情况进行详细计算与分析,找出潜在的抗震薄弱部位,对关键部位(构件)采取相应的构造加强措施,保证建筑结构的安全可靠.
Structural design and analysis of a Hotel tower
Due to the control requirements of planning indicators,A hotel project occupies a small area and has a high volume ratio.The change and conversion of equipment pipelines have a great impact on the structural design.There are many disadvantages such as irregular torsion,cross-layer column,transition,stiffness sudden change and clear height limitation.In this paper,by comparing and selecting va-rious structure schemes,the layout scheme which can meet both the requirement of clear height and the structure index is determined.The irregular situation is analyzed,and the irregular situation is calculated and analyzed in detail,the potential seismic weak parts are found out,and the corresponding structural strengthening measures are taken to ensure the safety and reliability of the building structure.

clear heightinterlayerirregulartransfer columncross-layer column

雷孝通、周琪

展开 >

厦门佰地建筑设计有限公司 福建厦门 361000

净高 夹层 不规则 转换柱 穿层柱

2024

福建建设科技
福建省建设厅科技情报中心站 福建省建筑科学研究院

福建建设科技

影响因子:0.5
ISSN:1006-3943
年,卷(期):2024.(1)
  • 4