BIM design for structural reinforcement of a reconstruction project
This project adopts the indirect reinforcement method of adding seismic walls on the structure,upgrading the structural system from a frame structure to a frame shear structure,improving the seismic performance of the structure,reducing the number of reinforcement positions and the amount of reinforcement.At the same time,BIM technology is used to support the entire process design of the renovation and reinforcement project.Through fine modeling and simulation of construction,BIM technology is used to guide and adjust the design in a timely manner.It realizes the integration of building renovation,reinforcement,decoration,and equipment design from the design sys-tem,thereby improving the quality of project design.