The application of BIM technology in tube comprehensive collision detection
With the increasing scale of housing buildings,the comprehensive layout of the electromechanical engineering is becoming more and more complicated.In order to avoid duplicate construction and waste of resources,this article takes the Fujian Lin Monitoring and Dis-patch Center project as an example,the BIM technology is applied to the comprehensive design and pipeline collision detection of the pro-ject,and the three-dimensional model is established.The Revit and MagiCAD software are used to detect the project pipeline,and opti-mize the unsatisfactory design in the drawings.Those can effectively solve the problem of pipelines and collisions between majors,guide the construction of on-site construction,save construction time and cost,and improve work efficiency.