水口水电站枢纽坝下拆除围堰施工技术及控制措施
Construction Technology and Control Measures of Removing Cofferdam under the Hub Dam of Shuikou Hydropower Station
林淑玲1
作者信息
- 1. 中国水利水电第十六工程局有限公司,福建 福州 350000
- 折叠
摘要
基于理论与实践相结合视角,以福建闽江水位治理与通航改善工程围堰拆除为案例,梳理一项适用性广、实操性易、指导性强的围堰拆除施工技术,重点分析围堰拆除施工总体布置、拆除工艺、围堰边坡稳定性、爆破拆除参数等,从施工技术、质量及安全三方面相应制定围堰拆除施工的控制措施,供类似水利水电工程围堰拆除施工指导.
Abstract
Based on the combination of theory and practice,taking the demolition of the embankment for the flood control and navigation im-provement project of the Minjiang River in Fujian as a case study,a systematic review of a practical and easy-to-operate embankment demolition construction technology is carried out.The paper also focuses on the embankment demolition construction technology,including the overall layout,demolition process,slope stability of the embankment,and blasting demolition parameters.Control measures are formula-ted from the perspectives of construction technology,quality and safety to provide practical guidance for similar hydropower and water con-servancy engineering embankment demolition construction technology.
关键词
围堰拆除/施工技术/控制措施/水利水电工程Key words
cofferdam removal/construction technique/control measure/water conservancy and hydropower engineering引用本文复制引用
出版年
2024