首页|超高大跨钢混结构斜拉桥稳定性非线性拟静态建模分析

超高大跨钢混结构斜拉桥稳定性非线性拟静态建模分析

扫码查看
为了降低超高大跨钢混结构斜拉桥极限承载力的计算相对误差,准确分析结构的稳定状态,提出一种非线性拟静态建模分析方法.选取反映结构稳定性的设计指标,构建稳定控制指标向量.结合简化力学模型与最大刚度矩阵,明确临界条件,建立斜拉桥稳定性非线性拟静态分析模型.以某大型超高大跨斜拉桥为例,利用该分析模型获得分析结果如下:位于斜拉桥两侧的立柱分别处于稳定状态和失稳状态、位于桥跨之间的立柱达到临界稳定状态后逐渐失稳.该模型计算的极限承载力相对误差均在0.50 以下,与真实值的偏差较小,说明构建的模型能够较准确低计算出结构极限承载力,有效分析了结构稳定性.
Nonlinear Quasi-static Modeling Analysis of Structural Stability of Super Tall Span Steel Concrete Cable-stayed Bridge
In order to reduce the relative error in the calculation of the ultimate bearing capacity of ultra high span steel-concrete cable-stayed bridges and accurately analyze the stable state of the structure,this article proposes a nonlinear quasi-static modeling analysis method.Select design indicators that reflect structural stability and construct a vector of stability control indicators.By combining a simplified mechanical model with the maximum stiffness matrix,clarifying the critical conditions,a nonlinear quasi-static analysis model for the stability of cable-stayed bridges is established.Taking a large and ultra high span cable-stayed bridge as an example,the analysis model was used to obtain the following results:Column located on both sides of the cable-stayed bridge are in stable and unstable states,respectively,and Column located between the bridge spans gradually becomes unstable after reaching the critical stable state.The relative error of the ultimate bearing capacity calculated by this model is below 0.50,and the deviation from the true value is small,indicating that the constructed model can accurately calculate the ultimate bearing capacity of the structure and effectively analyze the stability of the structure.

large spansteel concrete structurecable-stayed bridge structurenonlinear quasi-static modelingstability analysis

王飞

展开 >

中铁十一局集团第五工程有限公司,重庆 400037

大跨度 钢混结构 斜拉桥结构 非线性拟静态建模 稳定性分析

2024

粉煤灰综合利用
河北省墙体材料革新办公室 石家庄市粉煤灰综合利用和墙改办公室

粉煤灰综合利用

CSTPCD
影响因子:0.378
ISSN:1005-8249
年,卷(期):2024.38(6)