This work uses the large-scale geotechnical simulation analysis software midas GTS to simulate the sinking process of deepwater sunken wells under various working conditions.By comparing the on-site monitoring results,the deviation of sunken wells is analyzed.The action laws of the deviation of the open caisson were summarized,the rea-sons for the deviation of the engineering open caisson were analyzed,and the effectiveness of various correction meth-ods was calculated and evaluated.The specific conclusions of the article are as follows.Vehicle load is one of the main reasons for the deviation of the caisson along the bridge direction.The overall displacement of the caisson will increase with the increase of the height of the outer soil pile,and the two are positively correlated,but the relationship is non-linear.By adjusting the height difference of the open caisson through soil backfilling,the deviation can be gradually adjusted to achieve the purpose of correcting the deviation of the open caisson.To provide a basis and theoretical sup-port for the determination of deviation correction and protection methods for deepwater sunken wells.
关键词
深水/沉井基础/智能监控/纠偏/数值模拟
Key words
deep water/sinking well foundation/intelligent monitoring/correction/numerical simulation