The Application of Dynamic Design in the Project Management of Navigation Aids Distribution Engineering for theWater Diversion of the Yangtze River to the Huaihe River
Taking the EPC project of providing navigation aids for the water diversion project of the Yangtze River to the Huaihe River as the background,this article proposes to use dynamic design and its mechanisms to address the technical difficulties in the management of navigation aids engineering projects.Through feedback from the construction site and multi-party collaboration to verify and adjust the design plan dynamically,various problems encountered during the construction process can be solved in a timely manner.This approach can achieve the goals of improving project quality,shortening construction time,and saving investment,providing a reference for the application of EPC project management in the field of navigation aids engineering.
water diversion of the Yangtze River to the Huaihe Rivernavigation mark layoutEPCdynamic design